| Major iron ORE deposits uncovered at Haranga's Selenge Project |
|
|
|
|
Source: Haranga Resources Date: 21 September, 2011 Haranga Resources uncovered significant traces of iron ore at it its Bayantsogt site. All sixteen holes drilled for exploration have encountered mineralization and tests indicate at least five major iron deposits.Drilling began last July, reaching a total depth of 3,890 meters with holes varying between 12 and 54 meters. The company is currently waiting for further lab analysis on nine of its drilled holes. Drilling will continue with two rigs at Bayantsogt in addition to a third at other targets in its licensed area. |